Plazatio

AON

El Colegio casi Invisible

Salamanca . Salamanca . España

Detalles del proyecto

Tipo: Edificación
Superficie construida (m2): 2.600

Info

In the metropolitan area of ​​the city of Salamanca, the municipality of Villares de la Reina stands out for its transformation during the last decades as it has one of the industrial estates of the city. The changes have partly disfigured the scale and transformed the material landscape conditions. The almost invisible school proposes a reflection on the domestic scale of this kind of infrastructures, where the little ones must find spaces that they can catch, and places with which they can dream. The accessible plan from the outside, is a large ceramic plinth made up of vertical pieces with seven colors made by Toni Cumella, which symbolize, at the same time, the singularity and the equality of each boy and each girl, collecting and enclosing the scale of the courtyards and play areas. The upper areas are coated with a StacbondR composite aluminum finished mirror panel. These surfaces fade reflecting the sky and also the perimeter trees making this second level, necessary in the program, disappears like a magic game, and the school infrastructure recovers more domestic scales.

más info

publicado el 09/04/2018

No hay fotografías de la fase actual

Comentarios (0)

Proyecto promovido por:
CTAA . Colegio Territorial de Arquitectos de Alicante

 

Colegios asociados a Plazatio

Colegio Territorial de Arquitectos de Alicante Colegio Territorial de Arquitectos de Castellón Colegio Territorial de Arquitectos de Valencia Colegio Oficial de Arquitectos de la Comunidad Valenciana

Empresas colaboradoras de Plazatio

Dile Finstral Fiorentina Stone Gibeller Mapei Newker Niessen Porcelanosa Rainbird Sido Tecnolift Valero Xal IberoStone Hf Diseños ABC PCA SIMON PALPLASTIC LAESCANDELLA COSENTINO COVERTTO FreeDom ZAR

Ver vídeo de Youtube
add
Top